TTF Photocathodes Database

History of the operations for Transfer Box: REGAE 1

1 2
DateEventLocationTransferred fromConnected toCathode 1Cathode 2Cathode 3Cathode 4Cathode 5Gun
04/10/2011 10:00:00Cathode change DESY-HH-REGAE  REGAE Gun806.1807.1802.2
26/09/2011 12:54:00Connect DESY-HH-REGAE  REGAE Gun802.2806.1807.1 
23/09/2011 14:00:00Shipment DESY-HH-REGAE DESY-HH-PrepChamber  802.2806.1807.1 
23/09/2011 10:00:00Disconnect DESY-HH-PrepChamber   802.2806.1807.1 
21/09/2011 14:10:00Cathode change DESY-HH-PrepChamber  PrepChamber - DESY802.2806.1807.1 
15/09/2011 12:05:00Cathode change DESY-HH-PrepChamber  PrepChamber - DESY806.1807.1 
15/09/2011 12:04:00Cathode change DESY-HH-PrepChamber  PrepChamber - DESY806.1 
24/08/2011 09:01:00Cathode change DESY-HH-PrepChamber  PrepChamber - DESY 
24/08/2011 09:00:00Connect DESY-HH-PrepChamber  PrepChamber - DESY802.1803.1809.1 
20/08/2011 08:00:00Shipment DESY-HH-PrepChamber DESY-HH-REGAE  802.1803.1809.1 
19/08/2011 18:07:00Disconnect DESY-HH-REGAE   802.1803.1809.1 
11/08/2011 18:08:00Cathode change DESY-HH-REGAE  REGAE Gun802.1803.1809.1 
11/08/2011 18:07:00Cathode change DESY-HH-REGAE  REGAE Gun802.1809.1803.1
28/07/2011 11:00:00Connect DESY-HH-REGAE  REGAE Gun802.1803.1809.1 
24/07/2011 08:00:00Shipment DESY-HH-REGAE DESY-HH-PrepChamber  802.1803.1809.1 
DateEventLocationTransferred fromConnected toCathode 1Cathode 2Cathode 3Cathode 4Cathode 5Gun
1 2

Skip Navigation Links.
Collapse HomeHome
Collapse StatusStatus
Transfer Boxes
Laboratories
Collapse TrackingTracking
All transfers
Expand Transfer Box DESYTransfer Box DESY
Expand Transfer Box FNALTransfer Box FNAL
Expand Transfer Box LBNLTransfer Box LBNL
Gun Operations
Collapse ComponentsComponents
Expand All cathodesAll cathodes
Plugs
Rods
Collapse StatisticsStatistics
Total Transfers
Operation Lifetime
Collapse LabsLabs
TTF DB Home
LASA
DESY
FNAL
LBNL

Authored by Paolo Pierini, Daniele Sertore, and Laura Monaco LASA, 2002-2009.