TTF Photocathodes Database

History of the operations for Transfer Box: Long 4

1 2 3 4 5
DateEventLocationTransferred fromConnected toCathode 1Cathode 2Cathode 3Cathode 4Cathode 5Gun
18/07/2013 08:01:00Shipment DESY-HH-FLASH LASA  500.5105.273.3139.1 
16/07/2013 18:01:00Disconnect LASA   500.5105.273.3139.1 
15/07/2013 11:45:00Cathode change LASA  PrepChamber - LASA500.5105.273.3139.1 
15/07/2013 11:44:00Cathode change LASA  PrepChamber - LASA500.5105.2139.1 
15/07/2013 11:42:00Cathode change LASA  PrepChamber - LASA500.5105.273.3139.1 
15/07/2013 11:40:00Cathode change LASA  PrepChamber - LASA500.5105.273.3 
26/06/2013 10:52:00Cathode change LASA  PrepChamber - LASA500.5105.273.3139.1 
24/06/2013 09:06:00Cathode change LASA  PrepChamber - LASA500.5105.2139.1 
07/06/2013 17:03:00Cathode change LASA  PrepChamber - LASA500.5105.2 
05/06/2013 16:16:00Cathode change LASA  PrepChamber - LASA500.5 
17/05/2013 14:39:00Connect LASA  PrepChamber - LASA 
20/02/2013 08:00:00Shipment LASA DESY-HH-PrepChamber   
08/11/2012 14:09:00Disconnect DESY-HH-PrepChamber    
21/09/2012 13:42:00Cathode change DESY-HH-PrepChamber  PrepChamber - DESY 
21/08/2012 15:32:00Connect DESY-HH-PrepChamber  PrepChamber - DESY22.6613.1102.1625.1 
DateEventLocationTransferred fromConnected toCathode 1Cathode 2Cathode 3Cathode 4Cathode 5Gun
1 2 3 4 5

Skip Navigation Links.
Collapse HomeHome
Collapse StatusStatus
Transfer Boxes
Laboratories
Collapse TrackingTracking
All transfers
Collapse Transfer Box DESYTransfer Box DESY
Short 1
Short 2
Long 1
Long 2
Long 3
Long 4
Expand Transfer Box FNALTransfer Box FNAL
Expand Transfer Box LBNLTransfer Box LBNL
Gun Operations
Collapse ComponentsComponents
Expand All cathodesAll cathodes
Plugs
Rods
Collapse StatisticsStatistics
Total Transfers
Operation Lifetime
Collapse LabsLabs
TTF DB Home
LASA
DESY
FNAL
LBNL

Authored by Paolo Pierini, Daniele Sertore, and Laura Monaco LASA, 2002-2009.